Date: September 3, 2025 | Duration: 45 minutes
In this session, we’ll explore how one of the top ENR400 contractors, Hensel Phelps, transformed their approach to tracking construction progress on a complex airport project — and in the process, saved 2,964 hours of coordination time.
You’ll learn how they bridged the gap between collecting field data and turning it into actionable insights that drive real-time decisions, improve accuracy, and reduce costly rework.
Key Takeaways:
Why traditional progress tracking methods slow down projects
How to leverage existing data capture workflows without adding extra overhead
The role of AI-driven insights in improving progress accuracy and confidence
Practical strategies to cut down site walks and validation time
Quantifiable results: hours saved, rework avoided, and documentation reduced
Join this Webinar if you are:
Project Managers & Superintendents
VDC & Innovation Leaders
Field Engineers & QC Teams
Operations and Scheduling Teams
Superintendent
Hensel Phelps
Co-founder
Track3D
VDC Manager
Hensel Phelps
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s.
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s.
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s.
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s.
Blog This release focuses on giving enterprise teams the centralized
Blog If you’ve ever watched a superintendent frantically scribble notes
Blog Construction teams rely on multiple systems to manage designs,