Inside the Build: How Kaufman Lynn Stays on Track with Track3D
A Project Manager on Tracking Progress, Validating Pay Apps and Proving What's Been Built
Join Randy Perez, Senior Project Manager at Kaufman Lynn Construction, for a live conversation about a four-story, 80,000 sq ft municipal building where the interiors were built out of sequence and trades worked across floors at different stages. Hear how his team uses Track3D to track progress zone by zone, save 10–12 hours a month on pay app reviews, and keep a verified record of the build, including the work that’s already been covered up.
Save Your Seat
We respect your privacy. No spam, ever.
Out-of-Sequence Work. Moving Trades. One Accurate Picture of Progress.
When the work doesn’t follow a straight line, the questions don’t stop.
Randy walks through how his team replaced site walks and mid-meeting phone calls with measured progress data, and where Track3D has made the biggest difference on the job, from faster pay app reviews to an estimated $3,000–$4,000 saved on a single structural issue.
Meet the Speakers
A live conversation from the field, followed by Q&A.
Wherever You Sit on the Job, This Conversation Has Something for You.
Project & Construction Managers
See how a PM keeps the schedule on track, checks sub billing against the field, and walks into every meeting knowing where the project stands.
Superintendents & Field Leaders
See progress by floor, trade and zone, and spend less time on progress walks and phone updates.
Project Engineers
Work through field questions with the design team using captures, without a trip to site every time.
Project Controls & Finance Teams
Back every pay app review with measured progress and timestamped evidence of what’s installed.
Owners & Owner's Representatives
See how a GC keeps a verified record of the build, including the work that’s already been covered up.
Walk away knowing how one GC team keeps progress accurate, billing honest and every installed scope on record.