On-Demand Webinar
Inside the Build: How Kaufman Lynn Stays on Track with Track3D
About the Webinar
Four stories. 80,000 sq ft. Interiors built out of sequence, with trades working across floors at different stages.
This is a municipal building in South Florida, and Kaufman Lynn Construction needed one accurate picture of where every trade stood, week after week.
In this session, Randy Perez, Senior Project Manager at Kaufman Lynn Construction, joined David Swider, VP of Sales at Track3D, to walk through how his team uses Track3D to track progress zone by zone, save 10–12 hours a month on pay app reviews, and keep a verified record of the build, including the work that’s already been covered up.
Watch the Webinar
Fill in your details to access the recording.
We respect your privacy. No spam, ever.
What was covered
How to keep an accurate picture of progress when floors run out of sequence and trades move between them at different stages.
How measured progress replaced site walks and mid-meeting phone calls, with each trade’s percent complete by floor on screen in every sub meeting.
How Kaufman Lynn’s team checks pay apps against what’s actually installed, saving 10–12 hours a month and settling billing questions with timestamped captures.
How Kaufman Lynn’s team used earlier captures to answer questions about work behind walls and concrete, saving up to $4,000 on a single as-built verification.
How to work through field and design questions remotely, without a trip to site every time.