Skip to main content

Track3D

How Kaufman Lynn Stays on Track with Track3D.

Construction Quality Assurance vs Quality Control: Who Is Responsible for What 

Construction quality assurance (QA) is the planned system of standards and processes that prevents defects. Quality control (QC) is the hands-on checking of installed work against those standards as the building goes up. QA writes the rules. QC tests the work against them.  Quality assurance and quality control get used as if they mean the […]

LiDAR vs Photogrammetry for Construction: Which Method Fits Your Project 

LiDAR vs Photogrammetry for Construction: Which Method Fits Your Project

LiDAR measures distance directly with laser pulses. Photogrammetry builds 3D data from overlapping photos. That difference sits at the core of the LiDAR vs photogrammetry decision, and it plays out differently on a building project than on open terrain. LiDAR is the stronger choice for dense geometry, existing conditions and as-built checks. Photogrammetry is the […]

Construction Retainage Explained: How Documentation Helps Speed Release 

Trade partner project manager reviewing a closeout punch list and a pay application retainage line in a site office

Construction retainage is the part of each payment that the payer holds back until the work meets the contract terms. The owner holds it from the general contractor. The general contractor holds a matching share from each trade partner.  Owners use it to protect the project when work is left unfinished or defects show up […]

Earned Value Management in Construction: A Practical Guide

Six months into a $10 million project, the cost report shows $4.2 million in actual cost. The schedule called for 45% of the work by this date. Both numbers are accurate. Still, the project manager cannot say whether the job is ahead, behind, or over budget, because neither number measures the work installed.  Earned value […]

How to Track Construction Site Progress by Phase and Trade

At the weekly OAC meeting, the electrical foreman reports Level 4 rough-in at 70% complete. The superintendent estimates 55%, and the owner’s representative, working from last week’s photos, estimates 60%. All three walked the same floor, and none of them can explain how they reached their figure.  As per the KPMG Global Construction Survey, only […]

Construction Productivity Tracking: Measure Output, Not Hours.

The weekly report puts the Level 3 drywall at 62% complete, right where the project schedule says it should be. The labor report disagrees. The crew has already used 80% of the hours budgeted for that scope, and the finish date is now at risk even though the progress chart still looks fine.  That gap […]

Healthcare Construction: Track Above and Below the Ceiling

Site lead inspecting pipes and ductwork above an open ceiling grid in a hospital corridor under construction

Healthcare construction documentation is the record of what a care facility team built, inspected, and approved. It covers hospitals, clinics, and the work hidden above ceilings and inside walls. The record proves that the building matches the design, the code, and the infection control plan.  Once a ceiling closes, everything above it disappears. If the […]

Construction Document Management: Common Problems and Fixes

Project manager reviewing drawings on a tablet in a site office using construction document management software

Construction document management is the process of creating, storing, sharing, and tracking project documents so every team works from the current version. It covers drawings, RFIs, submittals, contracts, change orders, photos, and closeout records.  Most jobs do not slip because of one big document mistake. Small gaps pile up instead. A crew builds from an […]

AI Construction Progress Tracking: How It Works

AI-assisted construction progress tracking identifies installed framing and MEP elements on a commercial jobsite for comparison against the plan.

On Thursday afternoon, a PM needs a progress number for the owner meeting the next morning. The latest report is five days old. Three trades have worked since then. No one can say how much they installed. AI construction progress tracking closes that gap. It reads site capture and measures installed work against the plan. […]